AI-powered construction plan review interface showing trade-specific findings

Catch Costly Plan Errors
Before They Become RFIs

SheetIntel is AI-powered construction plan review software that analyzes PDF plan sets for scope gaps, trade conflicts, and missing specifications before you bid or build. A typical 50-page plan set is reviewed in under 10 minutes.

What Contractors Are Saying

Real feedback from GCs, subs, and estimators using SheetIntel.

"SheetIntel caught a major HVAC coordination issue that would have cost us $40K to fix in the field. Worth every penny."

Mike T.

Project Manager, Commercial GC — Nashville

"We use it on every tenant buildout now. The RFI generation alone saves 2 days of bid prep."

Sarah K.

Estimator, Retail GC — Atlanta

"Best AI tool in construction I have used. Simple, fast, and the output is professional and actionable."

David R.

Owner, MEP Sub — Dallas

What SheetIntel Finds in Your Plans

Everything your team needs to review construction plans with confidence.

Expert Plan Review

Expert Plan Review

AI reviews every sheet with trade-specific expertise — structural, mechanical, electrical, plumbing, and more.

Cross-Discipline Conflicts

Cross-Discipline Conflicts

Catch coordination issues between trades before they become expensive problems in the field.

Professional Reports

Professional Reports

Export detailed PDF reports for your team — clear findings, organized by trade and severity.

Built for Every Role on the Project

No matter where you sit on the team, SheetIntel gives you an edge.

Developers & Owners

Walk into your next architect meeting with full plan intelligence. Know what questions to ask before they hand you the bill.

Architects

QA check before you deliver — catch coordination issues first. Protect your reputation with every submittal.

Contractors

Know exactly what you're bidding before you price it. Surface scope gaps, missing details, and coordination risks.

Engineers

Cross-discipline conflict detection across all trades. Verify your design intent carries through the full set.

How It Works

Three simple steps from upload to insight.

1

Upload

Drag and drop your construction plans. We accept PDF files up to any plan set size.

2

Review

AI analyzes every sheet — identifying issues, conflicts, and missing details across all trades.

3

Export

Download a professional PDF report organized by trade, ready to share with your team.

Download Sample Report (PDF)

See exactly what you get — 42-sheet commercial project, 8 RFIs, $45K in pre-bid exposure identified

Real AI Plan Review

What SheetIntel Found in a Real Commercial Plan Set

50-sheet commercial coffee shop buildout. SheetIntel's AI reviewed all 50 sheets across 7 trades in under 10 minutes — generating 30 RFIs and identifying $47,000+ in potential change order exposure before the bid was submitted. Here's what it found, trade by trade.

50
Plan Sheets Reviewed
30
RFIs Generated
7
Trades Analyzed
$47K+
Potential Change Orders ID'd

Electrical — 7 RFIs, 4 High-Priority

MEP conflict detection and scope gap identification in electrical plans

  • HIGH
    Missing Sheet EG — Referenced on Sheet E8 for critical service entrance and CT cabinet requirements. Without this sheet, utility coordination and permit approval are blocked. Estimated delay cost: $8,000–$20,000.
  • HIGH
    Conflicting Cable Specs on Same Sheet — General Note F on Sheet E3 requires CAT-5e, but the Equipment Schedule on the same sheet specifies CAT-6 for the Site Controller. A sub who follows one note and not the other installs the wrong cable. Rework cost: $2,000–$5,000.
  • HIGH
    Cord & Plug Responsibility Matrix Unclear — Sheet E7 splits responsibility for cords and caps between EC, GC, and equipment vendors with no master matrix. Undefined scope leads to finger-pointing during commissioning.
  • MED
    Possible ADA Receptacle Height Violation — Mounting heights of 1'-2" AFF on Sheet E2A may fall below the 15" ADA minimum. Catch before rough-in to avoid required patching and rework.

Plumbing — Pipe Sizing Error Caught Before Rough-In

Automated scope gap identification in plumbing plans saved a costly rough-in mistake

  • HIGH
    4× Oversized Supply Pipe on Fixture Schedule — Sheet P5 lists 2" CW/HW supply for individual lavatory and water closet fixtures. Standard sizing is 1/2"–3/4". If built as drawn, the plumber installs 4× oversized pipe, wastes material, and fails inspection. Catching this before rough-in saves an estimated $4,000–$8,000 in demo and re-rough.
  • HIGH
    Grease Interceptor Condition Undefined — Plans call for reuse of an existing 1,000-gallon pre-cast interceptor but provide no inspection protocol or contingency if it fails condition review. Health department sign-off at risk.
  • HIGH
    Fixture Quantities Missing From Schedule — P5 fixture schedule lists types but no quantities for lavatories, water closets, or hand sinks. Estimators cannot price rough-in without this data.

Mechanical — Equipment Label Conflict Could Order Wrong Units

Cross-discipline MEP conflict detection flagged a labeling inconsistency before procurement

  • HIGH
    RTU vs. AHU Labeling Conflict — Sheet M2 references RTU-2 and RTU-3 in the Air Balance Schedule, but the floor plan and M3 equipment schedules list AHU-1, AHU-2, CU-1, and CU-2. Ordering rooftop units when split systems are specified — or vice versa — is a $15,000–$30,000 procurement mistake.
  • HIGH
    Two Exhaust Fans Missing From Equipment Schedule — HEF-2 and HEF-3 are shown on Sheet M2 but absent from the Fan Schedule on M3. No capacity, no electrical requirements, no spec. Cannot price or permit.
  • MED
    Duct Smoke Detector Locations Missing — Smoke detector shown in legend but no locations plotted on the plan. Fire marshal sign-off and occupancy permit at risk if not resolved before rough-in.

Sample RFI Output — Master Log

30 RFIs generated from 50-sheet set
RFI-ELE-001

Missing Sheet EG — Critical Service Entrance Documentation

Source: Sheet E8 — CT cabinet and meter requirements unresolved

HIGH
RFI-PLU-003

Verify supply pipe sizes — 2" CW/HW listed for individual fixtures is 4× oversized

Source: Sheet P5 — Standard sizing is 1/2"–3/4"; confirm before rough-in

HIGH
RFI-MEC-001

Equipment label discrepancy — RTU-2/RTU-3 vs. AHU-1/AHU-2 across sheets

Source: Sheets M2, M3 — Confirm system type before procurement

HIGH
RFI-ELE-003

Conflicting cable spec — CAT-5e in General Notes vs. CAT-6 in Equipment Schedule

Source: Sheet E3 — Both specs on same sheet; electrician will install wrong cable

HIGH
RFI-GC-001

Conflicting revision dates — 07/11/2025 vs. 03/04/26 on demolition and interior sheets

Source: Sheets D1, ID7 — Confirm which revision is current before issuing for construction

HIGH

This is what automated AI construction plan review looks like on a real commercial set. 30 RFIs. 50 sheets. Minutes, not days.

Run Your Plans — First Review Free

Simple, Transparent Pricing

Start free. Scale when you're ready.

Free

$0

Try it out — no credit card required.

  • Up to 10 pages per review
  • Basic plan analysis
  • PDF export
  • 1 free plan review
Get Started Free

Per Set

$49 / plan set

Less than 30 min of estimator time. One missed RFI costs $5K–$50K.

  • Unlimited pages per review
  • Full trade-specific analysis
  • Cross-discipline conflict detection
  • Professional PDF reports
Buy a Review

Starter

$99 / month

5 plan sets per month with full analysis & support.

  • Everything in Per Set
  • 5 plan sets per month
  • Review history
  • Email support
Start Starter Plan
Most Popular

Pro

$149 / month

Unlimited plan sets with priority processing & team seats.

  • Everything in Per Set
  • Unlimited plan sets
  • Team seats (up to 5)
  • Priority processing
  • Review history & comparisons
  • Dedicated support
Start Pro Plan

Ready to review your plans?

Upload your first set free. No credit card, no commitment — just better plan intelligence.